GRAND HAVEN (WOOD-AM) - Drivers on U.S. 31 in Grand Haven will see construction resume today.
The highway will be reduced to a single lane between 3rd and Jackson streets.
The northbound side will down to two lanes between Jackson and M-104. It will be down a single lane from M-104 to 3rd Street.
Ramp closures can also be expected.
Work is expected to run through May 1.
More at WOOD-TV.